The current position: Home> Products> Laboratory electric furnace> GSX Series of energy-efficient high-temperature sintering electric furnace

Click to enlarge

GSX Series of energy-efficient high-temperature sintering electric furnace

RELATED ARTICLES
    Introduction

    Applicable to laboratory and industrial inorganic materials sintered in the furnace, especially for zirconia, alumina, industrial production, the use of new materials and new design, the energy saving effect creating a new energy-saving electric furnace milestone.
    , The furnace power consumption is 25-30%, greatly saves energy and reduces the cost of the ordinary electric furnace.
    Second, shorten the production cycle. The electric furnace to save 50% and shorten the production cycle of the cooling time
    , Furnace uniformity product appearance
    Fourth, lift smooth, easy loading and unloading products.
    型 号 规 格
    炉膛尺寸
    长/宽/高mm
    额定烧结温度
    功 率
    kw
    控制方式
    GSX-1-13,16
    300/300/300
    1350,1650
    12,15
    32段程控
    GSX-2-13,16
    400/400/400
    1350,1650
    18,25
    32段程控
    GSX-3-13,16
    600/600/600
    1350,1650
    30,40
    32段程控
    GSX-4-13,16
    800/800/800
    1350,1650
    40, 60
    32段程控
    可定制各类尺寸、温度的非标电炉
    Example:


    I should Zhuzhou requirements of a company (production of zirconia, alumina, industrial supplies), 400/350/600 electric furnace production in 2005, and for small batch firing achieve good energy saving effect and shorten the production cycle basis on the design and manufacture. Its energy-saving effect creating a new energy-saving electric furnace milestone.
    The lift furnace design effective volume 600/600/600mm, 1650 ℃, ordinary electric furnace of the same specifications produced by a company of Yixing:
    An ordinary electric furnace to complete sintering (40 hours) to about 1000 degrees power, the new furnace When sintering was complete (40 hours) of about 230 degrees of power, savings of 770 degrees. Significantly save energy and reduce costs.
    Second, shorten the production cycle. Ordinary electric furnace to complete cooling takes about 3-4 days, new electric furnace to complete the cooling time is about 1-2 days. Two days, saving time and shorten the production cycle
    Third, the furnace temperature uniformity and appearance of the product after sintering
    Fourth, lift smooth, easy loading and unloading products.



    点击次数:897

    Order

    留言框

    • Theme:

    • Content:

    • Commpany:

    • Name:

    • Telephone:

    • Email:

    • Address:

    • Province:

    • Verification Code:

    Contact

    Email:130732189@qq.com
    Address:Add:No.168 Xiaotang east road,German Industrial Park,Xiangtan City,Hunan,China
    WeChat scan focuses on us:
    Service Contact Code

    Hotline

    86+0731-58534888,86+13607322318

    Sweep and pay attention to us.

    Baidu
    map